35e Avenue Project
Wall removal and complete renovation of the kitchen.
Brightness increase and a fully renovated kitchen
- We removed a load-bearing wall to increase the brightness.
- We leveled the floors, walls and ceilings.
- We redesigned the kitchen area.
- We installed a new kitchen.
Project | Structural work and kitchen renovation |
Year | 2022 |
Site | Rosemont, Montreal |
Surface area | 400 sq. ft. |
Energetic and
eco-sustainable work
eco-sustainable work
Structural work
Increase in brightness
AVANT
APRÈS